Project Background & Objectives

To secure power stability and offset rising operational costs, Asmar Wood partnered with Sustainable Energy Partners for a turnkey 332 kWp roof-mounted, grid-tied solar PV system in Mkalless, Lebanon. This deployment optimizes clean daytime generation during peak manufacturing shifts, stabilizing the facility's energy architecture and supporting environmental sustainability.

Operational Challenges & Logistics

Installing a major industrial solar array within an active production environment requires careful coordination. The project involved comprehensive structural roof-load validations for the 332 kWp array and precise electrical synchronization for the grid-tied setup to avoid any downtime. Sustainable Energy Partners managed all rigging and integration safely with zero interference to daily manufacturing routines.

System Performance & Sustainability Impact

Commissioning this industrial solar infrastructure provides immediate relief from grid dependence and lowers carbon intensity per unit produced. Asmar Wood minimizes its daily utility draw while achieving an environmental offset of 199.2 tons of carbon emission savings annually, demonstrating strong cost efficiency and environmental leadership.

Project Information

Name:

Asmar Wood PV System

Client:

Year:

Location:

Application:

SEP Scope:

EPC

System Type:

Structural Type:

Solar Capacity:

Battery Storage:

-

Diesel Generation:

-

Carbon Emission Savings: